Columbia MCB-50J Operations Instructions

Browse online or download Operations Instructions for Water heaters & boilers Columbia MCB-50J. Columbia MCB-50J Operating instructions User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
P/N 240009038, Rev. B [04/2012]
MCB SERIES II
Cast Iron Gas Fired Boilers
For Forced Hot Water
INSTALLATION, OPERATION &
MAINTENANCE MANUAL
Models
MCB-50J
MCB-75J
MCB-100J
MCB-125J
MCB-150J
MCB-170J
MCB-200J
Tested For 100 psi
ASME
Working Pressure
C.S.A. Certi ed
For Natural Gas Or Propane
Manufactured by:
ECR International, Inc.
2201 Dwyer Avenue, Utica NY 13501
web site: www.ecrinternational.com
Page view 0
1 2 3 4 5 6 ... 23 24

Summary of Contents

Page 1 - MCB SERIES II

P/N 240009038, Rev. B [04/2012]MCB SERIES IICast Iron Gas Fired Boilers For Forced Hot WaterINSTALLATION, OPERATION & MAINTENANCE MANUALModels MC

Page 2 - Table 1 - Dimensions

104 - CONNECTING SUPPLY AND RETURN PIPINGFigure 6 - Single Zone System With DHWFigure 7 - Multi Zone System With Circulators And DHW

Page 3

114 - CONNECTING SUPPLY AND RETURN PIPINGFigure 8 - Multi Zone System With Zone Valves And DHW (With Circulator)Figure 9 - Multi Zone System With Zone

Page 4

12When an existing boiler is removed from a common venting system, the system is likely to be too large for the proper venting of the appliances sill

Page 5 - 18"

131. Verify only boiler is serviced by Vent Damper. Figure 11.2. Clearance of not less than 6 inches (152mm) between Vent Damper and combustible mater

Page 6

148 - CONNECTING GAS SERVICEGeneral• Use piping materials and joining methods acceptable to authority having jurisdiction. In absence of such require

Page 7

159 - ELECTRICAL SECTIONELECTRICAL WIRINGSee wiring diagrams on the following two pages for details.Electrically bond boiler to ground in accordance w

Page 8

1610 - WIRING DIAGRAM Figure 13 - Integrated High Limit Electronic Ignition Control (240008781) WARNINGModifi cation, substitution or elimination of f

Page 9

1711 - LIGHTING INSTRUCTIONSLIGHTING PROCEDURE FOR BOILER WITH INTERMITTENT PILOT SYSTEMA. This appliance is equipped with an ignition device which a

Page 10

1812 - NORMAL SEQUENCE OF OPERATION13 - GENERAL INSTRUCTIONSThermostat actuates on call for heat, completing circuit to control. Completed circuit to

Page 11

1913 - GENERAL INSTRUCTIONSFigure 18 - Gas Burner FlameFigure 20 - Gas Burner PilotFigure 19 - Combustion ChamberBURNERSORIFICESGAS VALVE• Make visual

Page 12 - WARNING

2Table 1 - DimensionsBoiler No.Natural Gas Inlet*DimensionsPump size Supply & Return TappingsABCDEF50 ½" 11⅛"5½" 4" 30¾"

Page 13 - DAMPER LOCATIONS

20• Adjust gas input to boiler by removing protective cap on pressure regulator, and turning screw clockwise to increase input and counterclockwise

Page 14 - WHAT TO DO IF YOU SMELL GAS

2115 - CONTROL FUNCTION1 HI TEMP illuminates when boiler water temperature reaches high limit setting and remains lit until water temperature falls 10

Page 15

NOTES

Page 16

Date Service Performed Company Name & Tech Initials Company Address & Phone #

Page 17

COLUMBIA BOILER COMPANYMain offi ces and factoryPittstown, PA

Page 18

3Safety Symbols & WarningsThe following defi ned symbols are used throughout this manual to notify the reader of potential hazards of varying risk

Page 19 - 13 - GENERAL INSTRUCTIONS

4 Table 2 - Ratings and CapacitiesBoilerNo.(1) Input Mbh(1)Heating Capacity Mbh(2) Net AHRI Rating Water Mbh AFUENo.ofBurners(3)RecommendedA

Page 20

51. Installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel G

Page 21

63 - VENTILATION & COMBUSTION AIRProvide combustion air and ventilation air in accordance with the section “Air for Combustion and Ventilation,” o

Page 22

74 - CONNECTING SUPPLY AND RETURN PIPINGCheck local codes for maximum distance from fl oor or allowable safe point of discharge.RELIEF VALVEDISCHARGE L

Page 23

8Circulators in following illustrations are mounted on system supply side, mounting on system return side is also accept-able practice.1. Boiler used

Page 24 - Main offi ces and factory

9BOILERWATER INLETALTERNATECIRCULATORLOCATIONTO SYSTEMFROM SYSTEMCIRCULATORSHUT-OFFVALVEPRESSUREREDUCER VALVECHECK VALVEBALL VALVE3 WAY MIXINGVALVEAIR

Comments to this Manuals

No comments